2020 - what a year.

It’s been a funny old year, 2020. So far. It’s not even over yet. We’ve been busy during the COVID-19 crisis:

  • Data usage is 400% up

  • Customers are now online 24 hours a day

  • The lesser spotted ‘Electric Cable Finding Digger’ hit a few times - in one case, severing an 11,000 volt cable and blacking out 10 square miles of the Mearns.

  • As a result of above, we’ve installed our largest 8 sites with marine-grade battery backup to provide power backup for up to 20 hours. It’s wasnae cheap!

  • We’re installed a second Gigabit leased line to our transmission site in Montrose

  • Commissioned a new transmission site south of Fourdon with two 1 gigabit links

  • Replaced and overhauled many of our high speed links between sites

  • Replaced our 1 gigabit licensed link to Montrose with a 1.7 gigabit licensed link (going live soon)

  • Added another Licensed link south from the Garvock

  • Martin - our newest engineer - has now survived a year with us

  • Bill has given up the 1,000 mile a week commute and is now full-time on Marykirk.com. He’s already worn out two pairs of Crocs!

  • We now have engineering cover seven days a week, from 9am to 6pm.

  • Joined UK WISPA - the UK association for Wireless Internet Service Providers

  • Subscribed to an alternative dispute resolution service - Ombudsman Services

  • Joined the Scottish Government voucher scheme

And today we launched our new packages. See the main page!

Previous
Previous

Our new Logo

Next
Next

Merry Christmas!